ZPMC introduces new continuous screw-type ship unloader
NewsZPMC’s new continuous screw-type ship unloader, with a capacity of 600-2,000 tonnes per hour, advances eco-friendly bulk cargo handling.
The completion of the planned coal railway through Swaziland to Richards Bay has also been postponed, in this case by two years. The 146 km line will run from Lothair in South Africa’s Mpumalanga Province to Sidvokodvo in Swaziland, where it would connect with another line back into South Africa and on to Richards Bay Coal Terminal (RBCT). The project is designed to take general cargo traffic, including forestry and agricultural products, off the existing coal line, which will then have greatly
By registering you will have: