New grab for Genoa Bulk Terminal
NewsThrough Port Supplies Srl in Modena, Terminal Rinfuse Genova (TRGE – Genoa Bulk Terminal) has acquired a new 5.5 m3 mechanical clamshell grab from Peiner SMAG.
KCI Konecranes has received an order for a 35t gantry grab unloader from the Port of Le Havre for installation at the Multivrac terminal. Based on a conventional rope trolley configuration, it will incorporate a complete electrical system designed and supplied by Konecranes using its own motors and frequency controlled ac drives.
By registering you will have: