Bedeschi supplies Buzzi Unicem with a double-stage crushing unit
NewsThe system will receive limestone lumps of max. 600mm and will give as output limestone lumps <50 mm.
Italy-based Bedeschi had been selected to undertake the Primavera Project, a limestone storage facility for Votorantim Cimentos in Brazil. The supply contract consists of a storage system with two type STKP stacking bridges (Tripper TRP 16/1400) and a type BEL C reclaimer, with a stacking capacity of 700 tph and a reclaiming capacity of 100 to 500 t/hr.
By registering you will have: